Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why cracks are being developed in a structure? any specific
reason? is there any remedial solution?

Answer Posted / arvind rai

In Rcc structure ,mainly cracks devloped .This is due to not
proper cover maintained.
Cover block should be fixed in between reinforcement and bar.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

2110


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1806


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2766


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

2038


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

2518


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

2140


What is thumb rule for deep trench excavation

1812


what is flexible and rigid footing?

2378


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

2315


Prepare a Schedule for a Highrised building from starting stage to Handover?

1987


how much one carpenter can doing shuttering of slab in one day

3339


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1756


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1982


how many shuttering material required for 1000 sq.m built up area.

2378


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1746