What are fields need to be activated for the available check and TOR.
Answers were Sorted based on User's Feedback
Answer / shriya
In avilability check the feilds to be activated are
1. Material requirement
2. Materila Type
3. Schudule lines
4. checkig rule
5. Checking group
But in TOR you will have all the above except for the
checking rule which will only be there in Avilability check
Is This Answer Correct ? | 6 Yes | 0 No |
How to maintain number ranges for sales document types?
Where do you maintain factory calendar?
Why do you use Transaction Variant? a) To allow user parameter ID's to be applied only in enhancement transactions. b)To enhance variant characteristics to be used to ensure that the correct BOM items selected c)To allow you to specify fields as mandatory or hidden beyond the options provided in field selection. d) To allow variants for the materials & BOM selection screens
What is Batch Process?
How to create a billing document ?What is the transaction code?What is the transaction code for material posting ?
What is Revenue Recognition? It's relevance with SAP SD module along with it's detailed configuration procedure & steps?
7 Answers iGate, Maersk Line, Wipro,
what is materialdetermination? canyou do two material for one material?
HI,My name is Rafiq,i have completed my sap sd training from a good institute,and have very good knowledge on sap sd its been 1 1/2 yr learnt sap , i keep daily practising.I HAVE 6yrs of domain exp, but no real time sap exp. how do i go abt it.People say add fake exp of 4yrs and take a chance,is it a good idea , but here is always a risk factor. let me know how to go abt it. it would be appreciated. thanks for reading.
How you will release change request in SD module? How often you release them?
Does sap transportation management require the installation of sap erp? : transportation management
"Tables TCURM and T001W inconsistent". What it means? How to solve it?
2 Answers Indian Railways, Maersk,
How to create tasks. What are the maximum number of tasks you were created in you are previous project?