1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How can you achieve soil enforcement?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How much cement,sand,bricks and water needed for 1square metre brick work?
What is meaning of tlc
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
strength vs shape factor
Explain what is structural frames or systems?
What is difference between engineering stress and true stress?
what is the dimensions of river sand truck trailer or trolly ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
2nd and 4rt angle elevation used in which country ?
can i get civil engineering test papers.......?????
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils