1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
How is the strength of cement measured?
The 4 main factors to start a construction project are––
what are the five benefits of using standard terminology in the measurement process?
Define What is the tallest man made structure in the world?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
What is the primary difference between adsorption and absorption?
What are the different types of foundation?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
How to calculate plastering for elevated water storage tank
Detection of a beam & a girder are––––
Which stone is best for wall construction Laterite Stone or Cement Blocks
why demand factor less then 1 ?
what is the water-cement ratio of mix design while 30mpa in 7 days?