1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
what course did you consider thinking before you enrolled in college?
I want to join bhel because
What is OSHA compliance?
what pressure the NP2 class RCC pipe can sustain?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is chemical composion test
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is thumb rule for calculating the size of ISMB required for a particular length of span
what is polity
What are the methods of measurement? Describe it shortly
acceptance criteria for concrete works
What is difference between code and standard and specification?
Reinforcement details at hinged joint
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.