Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
No Answer is Posted For this Question
Be the First to Post Answer
How we calculate the service time of buildings
How many number of cement bags per running metre are required to cast pileof M-20 grade
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
DESIGN OF TRUSS ELEMENTS
Allowable wastage for ready mix concrete?
Why is concrete cube test carried out?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
How much material will consume for following specification water tank (9*7.5*6 feet)?
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
How can we find out the clear cover for a circular ring and rectangular ring..
Meaning of civil engg. in hindi
4 Answers NC Infracon, Reliance,
what is two point problem.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)