1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / mohammad naseem
There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level
| Is This Answer Correct ? | 21 Yes | 0 No |
Post New Answer View All Answers
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what is the price of a cubic meter of concrete on international market?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what is called Bulk Density of aggregate?
what is meant by shear center?????
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is the tallest man made structure in the world?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What is a tensile strength? What is the tensile strength of wood?
Explain what is 1/8 on the architect ruler denotes?
Detection of a beam & a girder areββββ
will fix foundation bolts at site with out template is there any procedure?
how to calculate the weight of concrete
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,