1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?

Answer Posted / mohammad naseem

There are two types of site civil engineer , first job is a
supervisory one if he works with the consultant, in this
case he needs to make sure that the document in hand is the
correct designed and issued for construction , then he will
supervise the construction contractor to make sure that
work is being carried out as designed and in accordance to
standards.
The second type , is the execution part where he works with
the construction contractor, in this case he has more
responsibilities, where he has to adhere to the design
document, quality of work, the schedule, safety of the
people, costs and more over to satisfy the consultant at a
personal level

Is This Answer Correct ?    21 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between shear and tensile strength?

653


What is the life of anaerobic Digester if it is used for municipal solid waste digetion.

1807


which formula used for calculate the area of segmental arch?

2351


How much cum. Brick work can do by 1 madon

1177


what is tension column?

1549






What is thumb rule in quantity and cost estimation of a residential building in civil engineering??

2573


what values & beliefs have guided you in your career path

2769


How can explode a block?

675


What are the applications of modulus of elasticity?

758


how to calculate number of bitumen for road asphalt

963


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1230


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1610


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1807


What is the quantity of cement in mix m20 concrete?

688


how can i calculate cement in brickwork

3460