1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / kanchan
First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
what is the percentage of silt in black cotton soil.?
What are the steps involved in the concreting process?
what is the ingredient value of 40mm and 20mm aggregates?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
For what purpose bedding is used under storm water drains, explain?
What is passive earth pressure ?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
Define What materials were used to build the Golden Gate Bridge?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is Time period of a building and its relation with frequency ?