Answer / rakesh

cement part = 1/5, sand part = 4/5
now 1m3 of cement weighs 1440 kg and cube contains only 1/5part of it as cement. therefore, 1/5* 1440 kg cement present . and rest as sand..i.e. 1440*4/5kg

Is This Answer Correct ?    3 Yes 0 No

What is the cement and sand consuption of 1:4 block work..

Answer / abdul rasheeth

cement &sand ratio is 1:4
i.e.,1 ratio cement for 4 ratio of sand
cement quantity for this ratio =ratio of cement/ratio of sand
=1/4=0.25 ratio cement
we know that 1 m^3 cement =1440 kg
therefore amount of cement =0.25*1440 = 360 kg/m^3
lly the amount of sand is =360*4 =1440 kg/m^3

Is This Answer Correct ?    6 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

Which tests are performed on soil to decide the type of foundation to be provided.

0 Answers   Student,


A person becomes tired when ups a stairs because of––

1 Answers  


#include<stdio.h> main() { int a=300,b,c; if(a>=400) b=300; c=200; printf("\n%d%d",b,c);

1 Answers  


Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design

0 Answers  


wat is the proportion of M40?

3 Answers  






ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????

2 Answers  


how i get all type of short type question answer about civil engg

0 Answers  


What is the thumb rule for calculating the number of chairs in slab?

4 Answers   Prism Cement,


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

0 Answers  


plumbing CPVC fitting FTE Brass full form

0 Answers   RK,


The relation between cube strength & cylinder strength because––

2 Answers  


what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)