Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the cement and sand consuption of 1:4 block work

Answers were Sorted based on User's Feedback



What is the cement and sand consuption of 1:4 block work..

Answer / rakesh

cement part = 1/5, sand part = 4/5
now 1m3 of cement weighs 1440 kg and cube contains only 1/5part of it as cement. therefore, 1/5* 1440 kg cement present . and rest as sand..i.e. 1440*4/5kg

Is This Answer Correct ?    3 Yes 0 No

What is the cement and sand consuption of 1:4 block work..

Answer / abdul rasheeth

cement &sand ratio is 1:4
i.e.,1 ratio cement for 4 ratio of sand
cement quantity for this ratio =ratio of cement/ratio of sand
=1/4=0.25 ratio cement
we know that 1 m^3 cement =1440 kg
therefore amount of cement =0.25*1440 = 360 kg/m^3
lly the amount of sand is =360*4 =1440 kg/m^3

Is This Answer Correct ?    6 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

Define What glue is least sticky?

0 Answers  


the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?

1 Answers  


How much used for sand per square meter in 12mm Thickness

1 Answers  


parts of stair-case?

3 Answers  


what is the thickness mortar between two bricks

14 Answers   bscpl, L&T,


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

0 Answers  


binding wire requirement in rcc structures

6 Answers  


how to calculate rate analysis for shuttering of waffle slab

0 Answers  


how much need sand and cement for 1 cft roof construction?

0 Answers   Indus Valley Construction IVCC,


How do you to separate Marble and Granite. What are difference between them?

2 Answers   Modi Builders,


How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.

3 Answers  


i want texture painting pwd data

0 Answers   Construction,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)