what is the cut length for Fe 500?
Answers were Sorted based on User's Feedback
Answer / m.selvam
Cut length of the Fe500 dia bar is
CL=(0.8L)+(2*(0.25*L))
L=length of the member or beam or column or slab
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pk
Cut lenght for ring.
A= l-2*cover
B= l-2*cover
cut length=2(A+B)+24d
for beam main baar
L=l-2*cover+9d+height of beam
| Is This Answer Correct ? | 0 Yes | 0 No |
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
what is diffreant between the english bond&flamish bond
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
curing of concrete why 7day's,14day's 21day's 28days
How foundation is designed, Column design and beam design
why curing is necessary?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Cement Co-eff. in block 1:6, brick1:4 work?
Soil Mechanic: You are building a gravel road. How much water do you need to mix in compact 100 m3 of road quantity borrow pit gravel?
bar bending schedule?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)