Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the use of plm (product lifecycle management) in sap pp?
How mrp (material requirement planning) types are classified?
Explain Flexible planning Procedure?
Explain transaction code KO88 or CO88.
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is 'mps' (master production scheduling)?
What is meaning of customized reports?
What is internal payroll process?
What is the use of mrp list?
How to create PRT master record?
How the process time is calculated in a wc when both labour, machine categories exist?
What is process keys
How to create object dependencies in a bom for a configurable material?
Explain how to create prt master records?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN