Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Mention how mrp (material requirement planning) types are classified?
What is MRP procedure
Mention what is the difference between stock transport order and stock transfer order?
What is routing in sap pp?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Difference between Item categories or what is variable size item or non stock item.
a company needs 12 standard values. how it can be maintained?
Can’t one material be assigned to more than one operation in a routine?
What is plm (product lifecycle management) in sap pp?
What happens to plan after it has been converted into production order?
How to delete a group of products that was created in screen mc84 ?
What does a PP Consultant do in his/her real time?
What is the planning time fence?
What is planning file entry
How requirements( pir,sles order, customer requirement) are reduced after they are produced?