Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain transaction code KO88 or CO88.
How are time management and payroll are integrated?
What are gaps? Some examples?
What are traffic lights in mrp?
In implementation stage tell some standard scenario before AS-Is & TO-BE
what are the problems you faced in MRP?
What are the t-codes for creating, changing and summarizing bom?
What are the MRP master data?
Explain how the pp module is organized in sap?
define variable cost
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is the use of data in work centers?
What is planning file entry
What is a ‘bom’?
What is the purpose of using capacity planning?