How much binding wire is required for one tone reinforcement ?
Answers were Sorted based on User's Feedback
Answer / harathi nitin
As per Joglaker (Quantity Surveyor Book) it is mentioned as
for every quintal of steel reinforcement ( 1 quintal =
100kg) 0.9 to 1.3kg of binding wire is required
for 100kg of steel reinforcement = 0.9 to 1.3kg of binding
wire
for 1 tonne (1000kg) = 9 to 13kg binding wire will be
required
Is This Answer Correct ? | 168 Yes | 19 No |
Answer / a.ramachandran
approximate 8kg, it is based upon thumb rule.
Is This Answer Correct ? | 81 Yes | 36 No |
Answer / pradipkrdeb
It should be 5 Kg to 6 Kg for one tone reinforcement.
Is This Answer Correct ? | 115 Yes | 84 No |
Answer / siva
Upto 16mm dia = 6.90/7.20kgs
20mm to 32mm = 8.00/8.30kgs
Is This Answer Correct ? | 52 Yes | 24 No |
Answer / t.chandrasekar
10 kg of binding wire is normally required for tying 1tonne
of reinforcement rods
Is This Answer Correct ? | 43 Yes | 20 No |
Answer / srinu.s
Genearly used for binding wire for 1tone
up to 8mm to 10 mm steel = 5kg/tone
12 mm to 16 mm steel= 6.5 to 7.65 kg/tone
20mm to 32 mm steel= 8.2 to 9.85 kg/tone
Is This Answer Correct ? | 31 Yes | 12 No |
Answer / jitendra
it depends on reinforcement work and gague of binding wire,
for overall calculation 12 kg consumed for Residential
building .steel binding wire
Is This Answer Correct ? | 34 Yes | 18 No |
Answer / surendra pal singh
one tone reinforcement required binding wire 10kg to 13kg
Note- depend on rcc strecture residential & commercial.
Is This Answer Correct ? | 19 Yes | 3 No |
How to calculate numbers of carpenter, fitter, mason, unskilled worker on the basis of built up area or floor plat area of building?
Wat is the optimum value of tensile strength of concrete after 28 days??
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the ratio of cement water and sand in RCC?
how much volume is one bag cement of 50kg
15 Answers Portland, RJB, UltraTech,
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
how to manage interview fear? and speak in english?
What is the cement and sand consuption of 1:4 block work
how to calculate quantity of steel & concrete in stair case
7 Answers Al Fara, Indu Projects, Orbit Corporation, Shree Shakti Enterprises,
The portion of a brick cut across the width is called?
how to check the quality of sand?
how preparing for barbending schedule ? how to preparig for two leged stirrups?