How much binding wire is required for one tone reinforcement ?
Answer Posted / jitendra
it depends on reinforcement work and gague of binding wire,
for overall calculation 12 kg consumed for Residential
building .steel binding wire
Is This Answer Correct ? | 34 Yes | 18 No |
Post New Answer View All Answers
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
Dear Sir What is the Contraction joint for base Slab
how many BSCs can i connect to the HUAWEI MSC
What are the important hardware systems used for cad?
questions with answers to face an interview of an civil engineer regarding RCC buidings
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
How to arrive d*d/162 , for finding the kg per meter , wt of steel
What is oneside mat. And explain
How to calculate unit weight of concrete for m40 grade.
What is the Null Point of chimney in Power Plant
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
what is right & short method of measurement of slab&beam
What is the tensile strength of wood?