Answer / shekhar kundena
8 to10 kg for 1MT of reinforcements depend on structural design.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mohammed aijaz hussain, modi b
Generally 4.5 kg to 5 kg of binding wire is consumed for
binding 1 Metric Tonne of steel and for Columns 1.5 kg is
consumed.
Is This Answer Correct ? | 12 Yes | 12 No |
Answer / vikash sharma
one ton m.s tmt bars using bending wire quantity's "12.5kgs"
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bilal khan
As per standard knowledge in all over the world we use in 1 ton 10kgwire only.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / simhachalam
One MT Steel is required 9- 13 kg of binding wire
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ananthbathmanaban
approximately 100 kg of steel required 1 kg of binding wire is required...so for one tone 10 kg of binding wire is required....
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / neeraj kumar
go through with relevent is codes and cpwd specification,
normally it is 7kg per tonne in all the dias and all
locations.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / partha pratim panja
As per Joglaker (Quantity Surveyor Book) it is mentioned as
for every quintal of steel reinforcement ( 1 quintal =
100kg) 0.9 to 1.3kg of binding wire is required
for 100kg of steel reinforcement = 0.9 to 1.0kg of binding
wire (18 swg)
for 1 tonne (1000kg) = 9 to 1 kg binding wire will be
required
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / shyam sundar mondal
it depend on dia of bar 8mm to12 mm dia road 6-8 kg /t
and 16-25 mm dia of bar 2.5 - 3 kg/t
Is This Answer Correct ? | 0 Yes | 6 No |
how much wall area covered by 1 kg of lapi(putty)
how to calculate the steel quantity for beams & columns also footing net? what is the formulae for calculate the steel quantity? what is mean by (100.3)plinth level?what is mean by 100.3? explained it?
what is the lap length on column? state the farmula plz with explaination.
what is the difference between red bricks& cement bricks
why there is need to provide shear reinforcement?give the basic reason?
9 Answers JMC, L&T, Power Grid,
what is ph value of water
What"s the brick size we use in construction?1.190x90x90 2.230x100x75 Which one "s correct?
curing of concrete why 7day's,14day's 21day's 28days
How many feet are in 4 square yards?
how to find water-cement ratio perfectly proportions M20, M25, M30
say you are requsituoning cement to build masonry wall made of burnt clay bricks. how many 50 kgs cement bags will you requisition for 1:5 ratio mortar joint, if they masonry wall volume is 10 m3
koi bta sakta ha ka steel ko calculate krna ka full mathod pls