I have used the proportion of cement:sand:gravel, is 1:2:4.
cement and the sand was provided by the company but i
provided the gravel. this combination was used to fill 500
cubic ft of wall. now i want to know how much gravel was
used in making the wall. can you guys please help me?
Answers were Sorted based on User's Feedback
Answer / fasil ebrahim
for finding amount of sand used 0.45x500= 225 cft
for gravel 0.9x500 = 450 cft
Is This Answer Correct ? | 0 Yes | 0 No |
which lime used in white washing
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?
2 Answers MBL Infrastructures,
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
How to calculate steel quantity in beam and column?
How do you compute volume of airflow?
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the the difference between piller base and wall base ? give cost difference ?
what is work of planning deptt. in any construction compny (in road project)
what is difference between active and passive earth pressure. how it effect the retaining wall design ?