How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?
Answers were Sorted based on User's Feedback
Answer / osama haggag
Quantity of works/production rate of one worker
production rate = work done/time
| Is This Answer Correct ? | 1 Yes | 1 No |
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
What is Definition Of Refuse Area In Building ?
1 Answers Arpee Group, Dudhwala Builders,
how must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.
17 Answers CCCL, Gulf Construction, KITECH, L&T, Mars Planning Engineering Services, NHAI, Simplex, Supertech, Yamaha,
12. Have you ever been asked to leave a position?
how water proof chemicals act in concrete to avoid leek?
0 Answers DDF Consultants, NSL,
what is slope provided to lying the sewerage pipe of different dia ?
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
difference between minor and major bridge.
Sir your company in receiver ment of civil engineering.
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
what type of surveying is used for inaccessible area??
3 Answers Keti Construction, Rites,
The definition of national highway
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)