How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?
Answers were Sorted based on User's Feedback
Answer / osama haggag
Quantity of works/production rate of one worker
production rate = work done/time
| Is This Answer Correct ? | 1 Yes | 1 No |
Quality control
silt maximum in sand.
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
How do you change a dimension value in solidsworks?
why we create short columns under grade slab?
Why do you want to work here
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
what is a civil enggineer ?
how to calculate the quantity of plaster.
How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)