How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?
Answers were Sorted based on User's Feedback
Answer / osama haggag
Quantity of works/production rate of one worker
production rate = work done/time
| Is This Answer Correct ? | 1 Yes | 1 No |
Difference between design mix and nominal mix
2 Answers Aegis, CCCL, UltraTech,
How to convert 0.44 N/MM2 in to Kgf/cm2
2 Answers Ukay Metal Industries,
what does the track parameter mean in staad.pro?
Explain your project management?
2 Answers HNB Engineers, Shell,
How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
What is factor of safety in the plastic method design?
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
How gate result to cube for 7 day? Formula for the cube testing?
1 Answers Ambuja, Indiabulls, Legacy,
what is slump
5 Answers JMC Projects, Puravankara,
what is the IS code no. for concrete wastage?
What is the difference between linear dimension and aligned dimension?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)