what is the ingrediants of wet mix macadam?construction
procedure?
Answers were Sorted based on User's Feedback
Answer / umesh vishnu patankar
40MM -35%,20MM -20%,10MM 20%Stone dust 25%
| Is This Answer Correct ? | 100 Yes | 20 No |
Answer / joseph
Wet mix is a blended form of road base having nominal size
of aggregate less than 37.5mm. It has high CBR value and
maximum dry density (normally greater than 2.4kg/m3).
| Is This Answer Correct ? | 45 Yes | 28 No |
Answer / p.krishna rao
40MM -30%,20MM -20%,10MM 25%Stone dust 25%
| Is This Answer Correct ? | 12 Yes | 8 No |
What is BOQ why to calculate BOQ
What is the mixing ratio of M7.5,m10,M30,m35&m40?
15 Answers Reliance, Umiya Construction,
For M30 grade how much cement bags will need for one cubic meter qty
What is m & 20.& what is fe&415.
lap lenth
Define What happens to Load at yielding ?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
how to calculate rate analysys of 1:6 plastering 10 sq m
how will deescribe pile foundation ?
If at site iam supposed to get M30.But by mistake i got M20 mix. How could I differentiate the mix before placing?
give me the mix proportion for design mix concrete M10 grade 1:4:8
13 Answers Gammon, IOCL, PSL, SDG, Simplee, STUP Consultants Pvt Ltd,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)