If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?
Answers were Sorted based on User's Feedback
Answer / nagori salim
R.M.C. supplier always provide Challan with each transit.
The Challan clearly shows the grade of concrete & the
quntity of ingredients in it, which differentiates the mix.
| Is This Answer Correct ? | 17 Yes | 1 No |
Answer / girish rawat
Always insist on Computer Batch reports from RMC suppliers.
It is always recommended to use Highlighter on Grade of
Concrete and Time of Batching for Quality Check
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / pramod
In case of this thing u cannot differentiate the mix before
placing. If this is possible then client also check it out
before placing.
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / alibaba
hi friends
cast the cubes 150*150*150mm and see the compressive strength of cube after 3 7 14 and 28days
| Is This Answer Correct ? | 3 Yes | 7 No |
Answer / chouhan
Dear
I dont think its useful instead of M30 to put M20 becose u have difrent like M20 is 20N/mm2 and M30 is 300n/mm2.
If you have any other solution pls share with so we can also use it on site.......... off course should get approval before apply.
| Is This Answer Correct ? | 0 Yes | 6 No |
fiends iam trying to solve if it correct reply me
take a container put 0.1 cu.m of concrete add some water in
it slowly try to drain out water separate sand and aggregate
weight it covert the obtained weight to 1 cu.m you come to
know the mix is m30 or m20
| Is This Answer Correct ? | 8 Yes | 23 No |
why are you joining in this (applied post) job and your aim for this job
can any one tell me how to estimate the reforcement of circular slab and also for dome.
what does 1 in 30 or 1 in 40 mean when constructing camber in roads.
How to find out slope footing concrete
0 Answers Ekta World, Punj Lloyd Ltd,
how much quantity a carpenter do shuttering per day
19 Answers Nexus Technologies, Tata Projects,
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
How is the strength of cement measured?
how calucate cement sand ratio for plstering
Name the standard sand for concrete tests
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is the stirrups? and which condition it is used?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)