give me the mix proportion for design mix concrete M10 grade
1:4:8
Answers were Sorted based on User's Feedback
Answer / hari haran
its cement:fine agg:coarse agg
if we take 1 bag of cement=50 kg
then
cement=50 kg
fine agg=50*4=200kg
coarse agg=50*8=400kg
water cement ratio=0.4
w/c=0.4*50=20 liters of water
Is This Answer Correct ? | 95 Yes | 23 No |
Answer / arun kumar
ITS MEAN 1:4:8
CEMENT:SAND:COARSE AGGREGATE
MEANS 1 BAG OF CEMENT, 4 BAGS OF SAND, 8 BAGS OF COARSE
AGGREGATES
Is This Answer Correct ? | 72 Yes | 17 No |
Answer / prashant rawat
M10 grade Ratio is 1:3:6 And 1:4:8 is M7.5
Is This Answer Correct ? | 49 Yes | 11 No |
Answer / nimmakayala
It not a design mix
It is a lean mix of proportion is 1:3:6(C:FA:CA)
Is This Answer Correct ? | 29 Yes | 2 No |
Answer / orient builders
1 4 8 means cement sand (fine aggregate) metal 20 mm (coarse
aggregate)respectively.
The ratio is based on volume and not in weight.
one bag of cement is 1.25 cubic foot
Therefore multiply the fine and coarse aggregate with 1.25.
Thus you have to use 1.25 cft of cement (one bag) and 5 cft
of sand and 10 cft of coarse aggregate.
As for sand is concerned bulkage allowance is to considered
according to which the quantity may slightly vary
Is This Answer Correct ? | 23 Yes | 4 No |
Nominal mix propertion of M10 PCC grade is 1:3:6 & Nominal
mix propertion of M .75 Is pcc grade for 1:4:8
Normally Mix design consider for above M20 grade as for Is
code 456
Is This Answer Correct ? | 18 Yes | 4 No |
Answer / sunil1505
its not a design mix. after m25 that called design mixes...
1:4:8 cement,sand,aggregate..water ratio is 0.4
m7.5 1:6
10 (1:4:8 and 1 :3:6)
15 1:2:4
20 1:1.5: 3
25 1 : 1 : 2
Is This Answer Correct ? | 9 Yes | 2 No |
Answer / kumar s
For M-10 grade nominal mix design is 1:3:6
For M-7.5 grade nominal mix design is 1:4:8
As per IS 456:2000, Nominal mix concrete may be used for concrete grades M-20 or lower. Design mix can be arrived with several trial mix design as per guideline proposed in IS 10262:2009. Example my trail design mix for M 10 is 1:3.5:6.10
Hope this will be useful for you...
Is This Answer Correct ? | 7 Yes | 0 No |
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
what do you understand by M25 concrete
what is procedure of ordinary pile foundation detial?
What is alternate bid?
Quality control
may i know the detailed description of cutting length
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
is there any simple field method to ascertained the bearing capacity of soil (with least arrangement/ Wedge penetration etc...).
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
The foundations are placed below ground level, to increase?
For the construction project what capital cost has to be taken in consideration?
What is m20 and What is 20 ?
2 Answers Sukhwani Constructions,