For M30 grade how much cement bags will need for one cubic meter qty
Answer / done
Unit wt of M30 concrete = 2400 cum (approx)
Each bag Wight's 50 kg
Therefore 2400/50=48 ~50 bags of cement will be required
| Is This Answer Correct ? | 2 Yes | 11 No |
please help me to find a mix design ratio for M40....
what is meant by point of contraflexure?
why elongation index is not required for concreteing coarse aggregate..
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
how statics is different from dynamics
Is density and unit weight are same, if not why both r having same unit, wats the difference between them.
How is rate analysis prepared for M 25 grade of concrete?
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
what is the method of all soil testing in lab?
Please i want to know how to find column main bar cat of length
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)