1. why we use inverted beam ?
2.why we use extra bar in beam ?
3.dimension in L-bar in column ,footing and beam
Answers were Sorted based on User's Feedback
Answer / sha
L bar means devolopment length...normally it is 46d(diamtr
of bar)
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / umesh gumme
We use inverted beam in that moment the distanjce b/w ceiling and flooring comes less...
Is This Answer Correct ? | 2 Yes | 1 No |
how to calculate mivan shuttering matrial
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
0 Answers Bhoomi Engineers Builders,
for mortar 1:18 how much cement and sand required for 1 CM
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
define silt?
how can we design dia of rainwater pipes ? plez explain by using formula ?
how to prepare analysis of hire charges for 62.5 KVA generator
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
The relation between cube strength & cylinder strength because––
how to calculate required shuttering material like props,spans,plates ..etc for a slab?
1 Answers NCC, Shoba Devlopers,
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,