Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is BOQ why to calculate BOQ

Answers were Sorted based on User's Feedback



What is BOQ why to calculate BOQ..

Answer / mohd hashiruddin

BOQ is defined as the bill of quantity 

in quantity surveying BOQ is prepared to show the cost of the material like no of cemnt bag, sand, brick,etc in a single sheet and sum is added to give the required rate for the various quantity

bill of quantity can be prepared separate for substructure and superstructure

Is This Answer Correct ?    12 Yes 2 No

What is BOQ why to calculate BOQ..

Answer / dhanraj

BOQ is defined as the bill of quantity

Is This Answer Correct ?    10 Yes 0 No

What is BOQ why to calculate BOQ..

Answer / b.nagaraju

BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.

Is This Answer Correct ?    0 Yes 0 No

What is BOQ why to calculate BOQ..

Answer / nafees

BOQ is basically we used for find out the quantity of materials whatw e used in constructions. like brickwork , cement, sand and RCC materials.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

WHAT do mean by M-309

1 Answers  


How to Calculate the spacing of bars if we use 12 mm dia. bars instead of 10 mm dia. bars. Whereas the 10 mm dia. bars spacing given 0.250 as pr drawing. ?

1 Answers  


I have an span length 16 ft c/c

0 Answers  


How you Confirm the Hard stratum for Driven cat in situ Pile work?

5 Answers   L&T,


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

0 Answers  


1:6 mortar, how many self life hours ?

4 Answers   CCCL, L&T,


Explain how you can turn off the display for dimension in CAD?

0 Answers  


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

0 Answers  


What is indicate Fe250 in steel structure?

2 Answers  


Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com

2 Answers  


If we use oil,inner on the column box, it'll make rust on the column steel?

4 Answers  


What is the slope of vertical wall ? quick ans

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)