why we are condecting the slump test for concrete?
Answers were Sorted based on User's Feedback
The slump test is conducted to find the workability of concrete.
| Is This Answer Correct ? | 44 Yes | 0 No |
Answer / mohammed aijaz hussain
It is performed to ensure that the water quantity in the mix
is optimum to give the required workability.
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / sjtbehera
slump test conduct for w/c ratio of concrete and control
the water ratio.
| Is This Answer Correct ? | 9 Yes | 3 No |
Answer / monte
to check the workability of fresh concrete, then to controll
water-cement ratio.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / daleyvidyasagar
Mainly slump testing conduct to know the workability of concrete.slump should be in specified limits otherwise it will reduce durability and strength of concrete.the slump range as below given:
75-100- for rcc works,
120-150 scc(self compacted concrete using for pile and shear walls)
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / bong mejia
read ASTM 143.
you will know all the answer.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / silpa
For finding the w/c Ratio
Slump height should maintain 60mm to 80 mm for
beams ,salb& columns.
| Is This Answer Correct ? | 7 Yes | 10 No |
Sir I am from jntuk R13 regulation...... Is there any chance to leave credits
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
How you can turn off the display for dimension in CAD?
How many Steel used in 1 cum tower foundation
Theemergency provisions of the constitution of india were greatly influenced by: a)the government of india act,1935 b)the constitution of canada c)the weimer constitution of germany d)the constitution of the united states
what is M20 ?
3 Answers L&T, Sukhwani Constructions,
what is workability,define it?
what is the meaning of M & 20
lap lenth
what is shear force
2 Answers NLC Neyveli Lignite Corporation Limited,
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
0 Answers Ministry of Agriculture,
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)