Answer / tejaswi
for 1 unit of cement , 4 units of sand and 8 units of
matal are added in 1:4:8 mix.
And for 1 unit of cement, 2 units of sand and 4 units of
matal are added in 1:2:4 mix.
Is This Answer Correct ? | 166 Yes | 39 No |
Answer / ramesh
Generally 1:4:8 concrete mix used for plain cement concrete
For making 1cum pcc required
40mm metal :0.92 cum
sand :0.46
cement :0.115 cum or 3.312 bags
Is This Answer Correct ? | 127 Yes | 20 No |
If you are considering 1:4:8; per each cubic meter you have
to arrive the quantities as under.
If 1+4+8= 1cum (dry mix); then
cement quantity will be 1/13 = 0.077 cum;(2.2 Bags of 50kg)
Sand Quantity will be 4/13= 0.31 cum and
the Quantity of Coarse aggregate shall be 8/13=0.62 cum.
But, the volume of dry concrete will be 1.5 times
(approx)the volume of wet concrete. So, if you want to
prepare a cum of wet concrete, multiply the above values by 1.5.
Is This Answer Correct ? | 90 Yes | 21 No |
Answer / mask
* In 1:4:8
Cement - 1.25 Cft
Sand - 5 Cft
Matal - 10 Cft
*In 1:2:4
Cement - 1.25 Cft
Sand - 2.5 Cft
Matal - 5 Cft
Is This Answer Correct ? | 45 Yes | 10 No |
Answer / navneet
the mix contains 1 part of cement, 2 parts of fine aggregate
and 4 parts of coarse aggregate
Is This Answer Correct ? | 23 Yes | 7 No |
Answer / narendra pawar
Generally 1:4:8 concrete mix used for plain cement concrete
For making 1cum pcc required
metal :0.616 cum
sand :0.308
cement :0.077 cum
0.077 + 0.308 + 0.616 = 1.001 cum
Is This Answer Correct ? | 26 Yes | 12 No |
Answer / vishal kumar chy
1:2:4 It means 1 unit of cement, 2 units of sand , 4 units of aggregates
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / kailash
1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.
Is This Answer Correct ? | 10 Yes | 10 No |
Answer / suraj
in 1:2:4 mixture 1 part is cement 2 part is coarse sand and
4 part is fine sand matal is nothing
Is This Answer Correct ? | 16 Yes | 27 No |
How do you prepare Material Recovery Statement for deduction from contractors bills?
hi i am working in a civil Lab .....they asked me to find out the compressive strength of concrete cubes after 7 days of curing....the value of load on CCT machine is 205KN how to convert it to Kg/cm2 ....plzz help me...........
TELL ME THE EQUATION FOR OGEE SPILLWAY
why does only water ads in concrete?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
what is meant by point of contraflexure?
why we providing 40mm cover to columns & 25mm to shear wall
how much weight of 20 mm aggregate in bras?
Explain your project management?
2 Answers HNB Engineers, Shell,
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
What are the responsibilities of a site manager?