why we are condecting the slump test for concrete?
Answer Posted / mohammed aijaz hussain
It is performed to ensure that the water quantity in the mix
is optimum to give the required workability.
Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
How to calculate chejja reinforcement
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Define What is an ice dam sock?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Howmuch bend to be provide for 200/600 BEEM
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how to disign cuplock shuttering and it's matireal requirement snd any related web site
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What is the average density of soil?
Mention what are the composition of a landfill?