I am practising engineer. I am searching for tutorial of
RCC T Girder design Example in staad pro.Do anybody has
this?please help
No Answer is Posted For this Question
Be the First to Post Answer
how to estimate shuttering form work or how to take off material quantity???
steam curing is not used in which cement
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
Definition of plinth beam & Uses.
how to tie 10 legged stirrups
What are the types of concrete
Describe a time when you anticipated potential problems and developed Preventive measures
0 Answers Graham Construction,
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
Where is the worlds longest elevator and how long is it?
what is the difference between stress and pressure??
What is the density of steel? what is the IS code for steel structures? 1t/m2 = ?KN/m2 ??