CORRECTION
Kindly furnish the relation between 7 days strength & 28
days compressive strength of Cement Concrete cubes. Can you
clarify whether the relation gets altered due to various
WATER-CEMENT ratios and type of cements?

Answers were Sorted based on User's Feedback



CORRECTION Kindly furnish the relation between ..

Answer / raghuram

2/3 OF THE 28 DAYS STRENGTH IS THE STRENGTH OF 7 DAYS .
RELATION WILL NEVER GET ALTERED DUE TO VARIOUS WATER CEMENT
RATIOS . IF THE WATER CEMENT RATIO CHANGES 28 DAYS STRENGTH
ALSO CHANGES ......................FINALLY AGAIN 7 DAYS
STRENGHT IS 2/3 OF THE FINAL 28 DAYS STRENGTH AFTER THE
WATER -CEMENT RATIO IS ALTERED

Is This Answer Correct ?    17 Yes 0 No

CORRECTION Kindly furnish the relation between ..

Answer / ramir v. agustin

In concrete testing samples aged in seven days should yield
70 percent of the specified strengt requirment and 28 days
sample should yield 100 percent of the compressive strength
required.Water cement ratio and amount of cement plays a
very important role in the production of good concrete.The
stregth of concrete depends on its water cement ratio

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Stander Size of Brick

11 Answers   Unitech,


How to fix steel in rectangular footins? I.e first along the length or first along the width??

1 Answers   NKG Infrastructure,


how much percent are used 20mm,10mm?

0 Answers   SCC,


can i get placement in 2nd or 3rd year in college..

2 Answers  


1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?

7 Answers  






what is density on steel bars?

3 Answers   AICL,


What was your synopsis for thesis topic?

1 Answers   L&T,


How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?

1 Answers   GMR,


how to remove the quantity of metal 1 and metal 2 in concrete

0 Answers   Karthik Industries,


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

0 Answers  


What is creep ,deflection and shrinkage in concrete

3 Answers  


How to do bbs in excel format

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)