how many days we should curing for
plastering,brickwork,concrete?

Answers were Sorted based on User's Feedback



how many days we should curing for plastering,brickwork,concrete?..

Answer / senthil kumar p

Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound

Is This Answer Correct ?    115 Yes 6 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / jai.vignesh

Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound

Is This Answer Correct ?    79 Yes 8 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / s

7day min

Is This Answer Correct ?    43 Yes 5 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ganesh mapari

7 Day for Brickwork and Plastering
14 Days for Concrete

Is This Answer Correct ?    36 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / venkataratnam.y

minimum 7days

Is This Answer Correct ?    21 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / udaya

It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter

Is This Answer Correct ?    24 Yes 7 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ram mohan rai

Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / engr.sameer

concrete need min 7 days contineous curing

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / naveen

28 days.

Is This Answer Correct ?    20 Yes 21 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / muraliyadav

This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete

Is This Answer Correct ?    10 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

0 Answers  


pointing raju,ayesha says"he is the son of my mother's brother's wife". how is ayesha related to raju?

8 Answers  


how to calculate length of bar

4 Answers  


a wall having area 100 sqft and bricks size 19cm*9cm*9cm so how many bricks required...

14 Answers   Jain Group,


What is meaning of tlc

0 Answers   Backbone,






how to prepare analysis of hire charges for 62.5 KVA generator

1 Answers  


how to check the quality of sand?

5 Answers   L&T,


What is meant by dimensioning?

0 Answers  


What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and steel grade60 fy=414 mpa

4 Answers   L&T,


how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?

13 Answers   L&T,


how many hacking to be made in one sqft for concrete surface before plastering as per the IS Code

17 Answers   L&T,


What does 'M' stands for in M24 bolt ?

2 Answers   Rites,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)