how many days we should curing for
plastering,brickwork,concrete?
Answers were Sorted based on User's Feedback
Answer / senthil kumar p
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
| Is This Answer Correct ? | 115 Yes | 6 No |
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
| Is This Answer Correct ? | 79 Yes | 8 No |
Answer / ganesh mapari
7 Day for Brickwork and Plastering
14 Days for Concrete
| Is This Answer Correct ? | 36 Yes | 3 No |
Answer / udaya
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
| Is This Answer Correct ? | 24 Yes | 7 No |
Answer / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / engr.sameer
concrete need min 7 days contineous curing
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / muraliyadav
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
| Is This Answer Correct ? | 10 Yes | 12 No |
What is the difference between nominal mix and design mix?
How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
what is tensile strength of {6,8,10,12,16,20}mm dia bar? also there were any formula?
what are the Cement Coefficient for Block Work & plastering Work?
How to find the material quantity in a cement Sand mortar for Stone masonry?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
How you Confirm the Hard stratum for Driven cat in situ Pile work?
how to calculate cube strength in percentage
mix design of concrete using indian standard methods
What quantity of 1.0 m3 bricks required?
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)