Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many days we should curing for
plastering,brickwork,concrete?

Answers were Sorted based on User's Feedback



how many days we should curing for plastering,brickwork,concrete?..

Answer / senthil kumar p

Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound

Is This Answer Correct ?    115 Yes 6 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / jai.vignesh

Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound

Is This Answer Correct ?    79 Yes 8 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / s

7day min

Is This Answer Correct ?    43 Yes 5 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ganesh mapari

7 Day for Brickwork and Plastering
14 Days for Concrete

Is This Answer Correct ?    36 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / venkataratnam.y

minimum 7days

Is This Answer Correct ?    21 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / udaya

It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter

Is This Answer Correct ?    24 Yes 7 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ram mohan rai

Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / engr.sameer

concrete need min 7 days contineous curing

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / naveen

28 days.

Is This Answer Correct ?    20 Yes 21 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / muraliyadav

This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete

Is This Answer Correct ?    10 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction work but which mm size can be used for different structural element such as beams,columns,slabs,footing ?

1 Answers   L&T,


How to calculate the water content cement ratio

3 Answers   Godway, Modern Construction Company,


Two types of piling

8 Answers  


The point of contraflexure occurs in

10 Answers  


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

0 Answers  


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

0 Answers   MPRDC,


How much actual % of wastage of steel.

5 Answers   NICE,


Explain what is the release of lien?

0 Answers  


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

0 Answers  


What is difference between code and standard and specification?

0 Answers  


how to convert cement, sand aggregate quantity from M3 to kg with full description?

0 Answers  


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

0 Answers   Talib and Shamsi Constructions,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)