how many days we should curing for
plastering,brickwork,concrete?

Answer Posted / s

7day min

Is This Answer Correct ?    43 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is critical path method (c.p.m)?

697


what could be the production cost of 1 cum of concrete by CP30 plant

1272


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1245


Calculation of Pier Cap with tapper area?

5761


What is missing report and how to prepare

1022






I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2310


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1438


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2137


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1706


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

1654


What is the difference between linear dimension and aligned dimension?

634


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1570


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1849


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

1631


How to get MEP technical,instaaltion & testing data for interview?

1603