what is the least count of auto level staff
Answers were Sorted based on User's Feedback
Answer / girish rawat
THE LEAST COUNT OF THE LEVELLING STAFF WAS 5MM EARLIER.
NOWADAYS YOU GET LEVELLING STAFF WHICH HAS 1MM ACCURACY ON
THE REAR SIDE. CHECK IT OUT
Is This Answer Correct ? | 38 Yes | 7 No |
Answer / sachin
The levelling staff shall generally comply with IS-11961-
1986.
Now a days for Total station circular staff being used and
the least count is around 0 mm.
so the least count of staff is not on instrument used like
auto level its depend on staff
Is This Answer Correct ? | 16 Yes | 7 No |
Answer / jagdish k. pandey
least count is staff not auto level 5 mm or 0 mm dipendet
level staff
Is This Answer Correct ? | 3 Yes | 1 No |
what is tension footing?
0 Answers Wah Engineering College,
purpose of binding wire in RCC.
what is steel consumption for high rise building column, beam, slab,footing
how to design paver block
What is the Density of Steel & Conccrete
what is the MSL?where is it located?
2 Answers C-Tech RC Design, Era Infra Engineering, IVRCL,
what is the grade of lean concrete?
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
how can calculate qty of steel required for one or two ways slabs..
If the proportions of concrete is a:b:c i.e if "a" parts of cement,"b" parts of fine aggregate & "c" parts of coarse aggregate are mixed by volume. Then the resulting volume will have a volume of ------? How?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,