how to calculate the dry wt of sand and cement for a
required design mix?for ex:M20
No Answer is Posted For this Question
Be the First to Post Answer
hai,i completed my b.tech civil.Recently i wrote the appsc exam for managers water supply engg.I want answers for general studies and civil engg paper2.If any body know or written that exam send to my mail id is ruksana.sk08@gmail.com.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
how to calculate the number of cement bags required for 1m3 of work
What are the different types of foundation?
What isthe formula for square
1 Answers Panchayati Raj Department,
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is the creep in concrete
400 ku d/c clearess ketan hota hai?
M30,M35,M40,M45 how much ratio
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
Instrument used for determining PH of water
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)