how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / jai.vignesh
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
| Is This Answer Correct ? | 79 Yes | 8 No |
Post New Answer View All Answers
why do we provide haunches in rcc box or underpasses?
What is the tallest man made structure in the world?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
What is the difference between yeild strength and compressive strength of steel???
What is meaning of FREE STANDING STAIRCASE ?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is meant by autocad?
cause of cylinder test failure
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
Define What is a kip?