What is CR (change Request) & how it is working? what are
stpes?
Answers were Sorted based on User's Feedback
Answer / pavanbala
Change Request comes from the user in support project, After
implementation user wants some thing to be added or modify
to the existing configuration in SAP,
Before doing CR the consultant must make analysis on CR the
effects on existing process and before doing CR consultant
must be get approval from the authorities.
Is This Answer Correct ? | 35 Yes | 0 No |
Answer / rabindra s
Change Request comes in support phase of a project after
implementation, any kind of change in the existing process
or any improvement or any type of change as per the user
request.
It may include ABAP change,or sometime configuration change
in both the cases functional consultant have to do the
feasiblity study and impact of change to the existing
process flow and act accordingly.
Change Request can be maintain in SAP solution manager if
you have configuration in your project.
Regarding the process step, yes it has proper approval
process,but again that depends on your organisation setting
and level of approvers.
in my project a CR must be approved from
1. Requestor of the CR
2. BPO of the Module say MM
3. CEO of the company.
After only when you received the duely singed CR, you are
allowed to move the changes means CR contained to
Production system.
and one morething i like to add is that CR is alwasy
created for major changes in the system,else generally
support message are created for minor modification.
Thank you Rabindra MM Consultant
Is This Answer Correct ? | 14 Yes | 2 No |
tell me invenotry management types?
hi all When I try to assign plant to company code,it shows an error: Valuation area missing in T001W SAVE AGAIN. I tried all the possible ways. .. how to solve this error
What is meant by MRP Type and lot sizing?
How do you check quota rating?
In your up gradation project 4.6B version to ECC6.0 what differences observed in SAP MM explain
Is there any special indicator to identify subcontract item in the material master?
What is the use of ‘split valuation’?
How is scrap accounted in subcontracting?
What are the configuration are client specific in mm ?
3 Answers Accenture, Dishnet, Neco,
What are the special procurement types?
What are the differences between company-owned special stocks and externally-owned special stocks?
which is the movement type in SAP whiihc do not have a reverse Movment type? E.g. 101 has reverse 102.