What"s mean by term of BOQ in construction?
Answers were Sorted based on User's Feedback
BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.
Is This Answer Correct ? | 214 Yes | 7 No |
Answer / mohamed ibrahim
BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..
Is This Answer Correct ? | 47 Yes | 16 No |
Answer / ashutosh aryan
A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
Is This Answer Correct ? | 17 Yes | 0 No |
Answer / sayed obaidullah
BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / asanga
The Bills of Quantities will only be used for valuing monthly progress and variation
Is This Answer Correct ? | 13 Yes | 7 No |
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
How to evaluate the elastic modulus of soil from the plate load test result? for example ..one of test results are here Max. settement =4.56mm(at 900kPa) Residual settlement = 4.02mm Maximum pressure on soil 900kpa Soil bearing capacity 300kpa Plate diameter=300mm Thickness =25mm Soil description =Grey, clayey silty SAND with gravels and rock fragments
ratio of sand, cement and metal in all concrete mix
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Name the standard sand for concrete tests
URGENT: please tell me what's normal drawing scale for residential building and commercial building? Thanks.
Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?
What is expansion joint
What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
Plaster area is 1000 sqft thickness is 12 mm so what will be the quantity of cement and sand