What"s mean by term of BOQ in construction?
Answer Posted / punit
BOQ means Bill Of Quantities.
| Is This Answer Correct ? | 41 Yes | 7 No |
Post New Answer View All Answers
What is progress payment?
How to calculate paint drums per meter square
which red: used in roof teping, then use only cement
what is work of planning deptt. in any construction compny (in road project)
In the roof of a pumping station explain briefly the components of a waterproofing system?
For what purpose bedding is used under storm water drains?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
what else we can add rather than admixture in concrete to reduce the cement quantity?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
All aptitude question of Bechtel
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How to calculate the quantity of ingredients of M20 grade concrete?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How is the leaning tower of pisa supported?