civil engineering is branch that deals with constucrtion.
and we cant do anything without civil engineer. All
engineering branches deals with civil enginnering
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / m. jahir hussain
TOTAL VOLUME
1000 X 4" = 330Cubfeet
330/35.28 = 9.35 cubmeter
SLAB CONCRETE RATIO 1:2:4
1.57/7 = 0.2242
0.2242 X 1440 =323 KG CEMENT/M3
BAG IS 6.45 BAG OR 6.5 BAGS/M3
OUR SLAB VOLUME IS 9.35M3
9.35 X 6.5 = 60.775 BAGS OR 61 BAGS
| Is This Answer Correct ? | 8 Yes | 9 No |
what is the relation between pitch of steel and depth of slab?
what is the measure of slump
what is the advantage and disadvantage of using stone dust as a fine aggregate in concrete?????????
Insted of water is there any liquid to mix in concrete / in mortar ?
what is the spacing required for chairs for reinforcing in raft footing.
Sunk slab means what ?
what is the formula for Mass of cement grout (Dg)=???
How could I calculate quantities of fine aggrigates(sand) & coarse aggregates in pcc M15
1 Answers Coromandel, RECPDCL,
what is tie beam? & its function . uses of tie beam.
What is the technical name for aggregate stored in trepizoidal shape near railway station.
What is passive earth pressure ?
construction workers how much time take one work or qty
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)