What"s mean by term of BOQ in construction?

Answer Posted / asanga

The Bills of Quantities will only be used for valuing monthly progress and variation

Is This Answer Correct ?    13 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the meaning of degreasing of the euipment or line.

3301


how to nfind out the specific gravity of sand.aggregate,water please help...

1680


What is a projection line?

703


Does VDF add strength to the flooring apart from preventing water ingress?

1055


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1368






How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1419


pls give me some basic informations in construction of a structure?

1597


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3001


How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?

1435


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1693


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1795


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1388


what is the specific gravity of rubble in plum concert

968


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1338


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3223