What"s mean by term of BOQ in construction?

Answer Posted / sayed obaidullah

BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.

Is This Answer Correct ?    13 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1568


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1200


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1374


What is the minimum size of the particles of silt soil?

787


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1439






What are the different approaches in designing the floors of the service reservoirs?

752


why we create short columns under grade slab?

1832


how to check and keep control on the wastage of material at site

1849


What are the different methods for drawing an arc?

693


Calculation of Pier Cap with tapper area?

5754


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1708


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1253


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1648


what is the function of GSB all class ?

664


Consumption of Binding wire for fixing of cover block in vertical surface

1030