What"s mean by term of BOQ in construction?

Answer Posted / ashutosh aryan

A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.

Is This Answer Correct ?    17 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2062


what could be the production cost of 1 cum of concrete by CP30 plant

1264


How do You Maintain a structure after getting cube test of low strength.

1820


cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1878


List out some of the software program that can be useful for architect?

671






How much time Required for PPR pipe network testing

1684


what is the meaning of 40/20 src

5754


what does the grad of cement shows (denotes)?

1138


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1492


what is the difference between np2 and np3 concrete mix

1546


how clculate excavated or backfilling quantity by simpson's rule

4727


20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

2216


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

655


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1653


what is the productivity in aluminium shuttering per day

1565