Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Please explain me abt PQ diagaram in the power sector.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

what are the parameters plays a major role in Potential transformer Burden calculation??

0 Answers   ABB,


What is maximum permissible length of cable from transformer (33kV/0.433kV) HT side to HT panel which contain VCB? In which standard i shall get this information.

6 Answers   MSEB,


What is minimum permicible value of leackage current for LT Panle when applying voltage up to 3 KV for 5 Minuits?

0 Answers   BFL,


can any one help me? 1.what is corona extinction voltage&corona inception volatage 2.what is mean by CFVV?

1 Answers   KSEB,


Do you know the faults occurs generally in motors and how to rectify them?

4 Answers  


how to Select Lighting arrester? What r the parameters to be considered for the selection of Lighting arrester ?

0 Answers  


What are all present producing cost of Per KWH of various Fuel?

0 Answers   Sanmar,


What do we use in Motor core laminations..???CRGO or CRNGO..and why..????

1 Answers  


What are the advantages of instrument transformer?

0 Answers  


1.why ACB is not connected in HT side what Happens? 2.how much voltage maintained in ACB breaker? 3.OLTC is connected in primary side in case secondary side connected what happened?

3 Answers   L&T,


how to crack cgpsc,which type of knowledge it is required,where i can get systematic study material and some tips?

1 Answers  


How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?

0 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)