When we giving the 3 phase supply to ups system how to
coming netural?
No Answer is Posted For this Question
Be the First to Post Answer
Why mostly GT(Generating Transformer)has only Ynd1 Vector Group?
How to justify this statement ??? "Capacitors in series provide less capacitance but higher voltage breakdown rating for the combination"
how to calculate current when LT supply 415v fed to HT Motor 6.6kv and 1120kw.
Why current leads the voltage in case of capacitor load? Why voltage leads the current in case of inductive load? Why both are with in phase in case of restive load?
why voltage rating of transformers are in multiples of 1.1?
Match the following a)(X'+Y') b)X'Y' C)XY 1)NAND 2)NOR 3)Carry
Write a note on materials used as a fuse element.
What is a soft start?
if the voltage across the lamp drops by 1%, the power drawn will be reduced by how many %?
how to amps calculate from 1KVA?
why write 500v on line tester (Test pen)
I am working as a software engineer for the past 4 years. I am interested to do M.tech in premier inst. like IIT, IIIT, NIT,... I am preparing for the GATE exam for the past 2 years. Can anyone tell me how about the placement in IIT's for m.tech in (microelectronics and vlsi or electronics related discipline). Some of them are telling like placement is very rare for m.tech electronics. Also the placement details in IIT websites are not true. Is that so ? can any one help us regarding this.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)