Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answer Posted / shahnawaz

calculation for 1:2:4(M15)
take 50%extra for shrinkage/wastage
1+.5=1.5/1+2+4=.214
now, in 1 bag of cement having qty =.0347cum
so,.214/.0347=6.16 no of bags.
for sand,.214x2=.428 cum
for aggregate,.214x4=.856cum
for cft just x35.31

Is This Answer Correct ?    7 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

which has high compressive strength between hollow block and brick masonry?

2388


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

2077


trapozidal

2505


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

2243


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

2266


I need model question papers for writing the Dubai municipality exam,for G+1

10619


what is flexible and rigid footing?

2392


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

2201


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

2115


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2613


What are the alternate material for steel, Sand and aggregate

2386


What are the advantages of cad software’s?

1111


Why is concrete cube test carried out?

1258


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2642


HOw much % of premium on DSR-2013 currently

1967