Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answer Posted / shubham kumar

M15=1:2:4. for cement concrete. 101â„… right answer

calculate

a. cement. 1×1.54/7=0.22cum×28.8(for bag)=6.33 bags

b. sand 2×1.54/7=0.44 cubic metre

c. aggregate. 4×1.54/7=0.88 cum

Is This Answer Correct ?    8 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

2251


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1835


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2413


What is the ideal size of the living room ranges from small to large size?

1144


Define different types of roof systems?

1191


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2317


What are the applications of cad?

1271


How many mortar required for Brickwork of 1 Cu.m works??

1528


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2483


Who name us Engineer & Why?

2515


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2330


Why are the bolts that hold steel rails together in oval holes?

1162


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

94701


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1978


What will be weight of 0.5mm GI sheet per sq.ft?

17591