what do we mean by hook up drawing. what r the information we
get from it?
Answers were Sorted based on User's Feedback
Answer / maulik vyas
hook-up drgs provides detialed information about how to
install an instrument in proper manner..
it also includes the details of Bill Of Materials..
It is necessary document for project engineering as well as
maintenance dpt..
Is This Answer Correct ? | 53 Yes | 3 No |
Answer / mohd shafi
HOOK UP DRAWINGS: The process has hook up(transfer) or
arrested into field instruments is called as hook up.
there are different types of hook up depends upon the fluid
properties.
From the hook up drawing shows that How to install the
tubings in the process pipe line to instruments, Bill of
Quantity, Material specification....all the detail
information about the hook up including slops.
Is This Answer Correct ? | 20 Yes | 2 No |
Answer / jaysoon
hook up drawing is refrence or information engineering
installation also specification the equipment to be install.
Is This Answer Correct ? | 15 Yes | 3 No |
Answer / janes
In any process Industry, Instrument to be mounted properly
to get the Correct Reading. Hook-up drgs provides detialed
information about Instrument Installation with respect to
the Process Fluid.
Also Hookup drawing is use to specify the Scope of Piping
Department and Instrumentation Department.
Also Hookups are required for Operation and Maintation.
It Provide the the details of Bill Of Materials..
Is This Answer Correct ? | 12 Yes | 1 No |
Answer / bala
Hook up drawing: it's a drawing that details about
1) Installation procedure based on type of fluid & its
parameters like temp, pressure, flow rate
2) Type of material to be used to measure based on fluid &
its parmeters.
3) Scope of work between mechanical & Instrumentation.
4) Bill of materials
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / denizen360
hook up drawing is a which represent the connection between
the instrument and process line..
which is used to prepare bill of material..
2 types of hook up are there..
1.pneumatic hook up
2.process hook up
source: http://instrumentpedia.blogspot.com/2010/12/what-is-
hookups-drawing-and-how-to-read.html
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / gopi shukla
Hook-up drawing is a detailed drawing showing typical installation of instrument in a correct manner so that instrument operates properly (gives accurate indication and prevent any issued which could potentially affect the measurement such as liquid trap in gas impulse line).
Hook-up drawing indicates tubing slopes, position of instrument in reference to process tapping point, scope break between instrument vs piping.
There are two types of hook-up drawing:
Process Hook-Up
This hook-up drawing contains typical installations for instrument which connects to the process
Pneumatic Hook-Up
This hook-up drawing contains typical installations for instrument which requires instrument air such as control valve, actuated valve
Is This Answer Correct ? | 6 Yes | 1 No |
can we replace a slot sensor (inductive type) with limit switch (potenial free contact / no-nc type).
Whatis the reset ofset and control system in instrumentation
0 Answers Asyad International Company, CAE, Sugar Factory,
What is deffrence between Battery and capacitor
how u calculate ai/di/ao/do capacity in ur dcs?
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel
what is difference btween rotameter and orifice plate?
What is the syllabus for Instrumentation Engineers, who wish to join the Public Sector Units??
Sir, I want junior executive, Instrumentation question papaer for IOCL, Plz send to arabinda.ghosh83@gmail.com
What does a fire detector detects?
Explain Split Range Control In Control Valve Briefly.
1,why we use 4-20 ma output of all instrument qhy not use 0- 20, 2,what is the different between PLC & DCS. 3,how can we meaure maximum span of new flowmeter if not given any information.