Answer / upenderreddy
both are advisable according to the traffic volume,cost of
construction and cost of maintanance.for rigid pavement
life will be more,maintanance cost will be less but the
cost of construction will be more.for flexible pavements
cost of construction is less but maintanance cost is more
and its life is less,visibility during night time is less
compared to the rigid pavement.
| Is This Answer Correct ? | 11 Yes | 4 No |
Answer / sachin
FLIXIBLE PAVEMENT IS ADVISABLE DUE TO ITS ECONOMY,EASY TO
MAINTAIN .
| Is This Answer Correct ? | 8 Yes | 3 No |
Answer / 03265523
rigid pavement is used for water logged areas, but
maintenance cost is more when compared with flexible
pavement and maintenance work is difficult. so my advice is
flexible pavement is better
| Is This Answer Correct ? | 8 Yes | 6 No |
Answer / indra phukon
Rigid pavement is peferable in extensive rainfall area,
however the initial investment is more. A techno-economic
study is required considering life of pavement, initial
cost,maintainance cost and driving comfort before selecting
wheather it should be the flexible pavement or rigid
pavement. The behaviour of rigid pavement against
earthquake particularly Zone-IV & V also has to be studided
while selecting rigid pavement.
| Is This Answer Correct ? | 3 Yes | 2 No |
What are new technologies in civil engr. that can reduce construction cost?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is porosity??
What are advancements in civil engineering?
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how many types of survey and what are levelling instrument?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)