How many bricks in one cubic meter?
Birck size 22.9*11.4*7.6 joint 12mm
Give me answer with calculations
Answers were Sorted based on User's Feedback
Answer / shanmugam
for 1m3 of brick work = 500 nos needed but it is theoritical only, 490 bricks is needed, to check this take total volume of brick work and then count the no how much brick is needed for that volume and then covert it for 1m3 volume you will get doubts clarified
| Is This Answer Correct ? | 38 Yes | 10 No |
Answer / thenraj
size of bricks with joint = 0.241*0.126*0.088,Number
of bricks =1 /(size of bricks with joint) = 1 /
(.241x0.126x0.088) = 1/ (0.002672208) =374.22 / cum we
take 375 number of bricks / cum
| Is This Answer Correct ? | 48 Yes | 25 No |
Answer / deepak
size of bricks with joint = 0.241*0.126*0.088,
Number of bricks =1 /(size of bricks with joint)(i am
taking half thickness of a joint with a brick size)
= 1 /
(.235x0.120x0.082)
= 1/ (0.0023125)
=432.43 / cum we
take 432 number of bricks / cum
| Is This Answer Correct ? | 17 Yes | 11 No |
Answer / suresh bariya
Given Size of brick = 0.229m X 0.114m X 0.076m
Considering the brick wall thickness is 114mm
Size of brick with 12mm mortar = 0.241m X 0.114m X 0.088m
Volume of brick with mortar =0.0024 m3
Volume of brick wall with mortar =1 m3
Volume of brick wall with mortar /
No's of brick in wall = --------------------------------
Volume of brick with mortar
= 1/ 0.0024 =413 no's
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / harpreet singh
as per PWD there is 462 bricks in one cubic meter in there measurement book they take 462 no. of bricks
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rahul chaudhary
Volumn of one brick with mortar= .241×.126×.088=0.002429 m^3
So the no of bricks in 1 cum= 1/0.002429 = 411 nos + add 5% wastage
= 411+20.55 =431.55 nos
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / pankaj tiwari
Bricks size-229mm*114mm*76mm, Volume of brick=0.001958
Volume of brick with mortar -241MM*126MM*88MM=0.002672
1M3 Required No,s of Bricks with mortar =374.25
1M3 Required No,s of Bricks with out mortar =510.72
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / guest
Hi
R u aware of faloowing things
1:Naminal thickness and Actuval tickness of wall?
2;Dry volume of mortor ?
3: Extra mortor rqd forg filling ?
4:westage norms of different meteriels?
5:Standard jont thickness in maasonary wall if yes R u
aware of practical thk ness maintained by masons on site
All thise factores we have to considere then only we ll
able get rqd qty of metereal
PLs dot miss guied the people
| Is This Answer Correct ? | 8 Yes | 19 No |
what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???
what type offoundation suitable for clayey type soil
What is language of Engineering?
Define What is an ice dam sock?
internal dia of sewer pipe should not be less than A] 15 cm B ] 20 cm C ] 25 cm
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
How you can turn off the display for dimension in CAD?
what is the FE415 & FE500?WHAT IS ITS STRENGTH?
best hand book for civil engineers with practical criteria
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)