Which pavement is advisable in India?(Flexible or Rigid)

Answer Posted / 03265523

rigid pavement is used for water logged areas, but
maintenance cost is more when compared with flexible
pavement and maintenance work is difficult. so my advice is
flexible pavement is better

Is This Answer Correct ?    8 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate construction cost of residential building in mumbai

1470


How many cement sand ballast in cc 1:4:8 40mm

1534


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1668


what is civil engineer greatest strength and weakness?

13366


What does a construction cost covers and what does not?

735






Formula for calculation volume of essentric footing

1262


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1459


PL.tell me about civil engineering questions with answer

2114


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4575


at which depth the construction of tunnel is economical from cost and engineering aspect.

1309


insted of bentonite we can use any alternate material in piling ?

1700


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1207


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1304


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

1970


What difference comes in constructing of house and a housing complex like society

1422