Which pavement is advisable in India?(Flexible or Rigid)
Answer Posted / indra phukon
Rigid pavement is peferable in extensive rainfall area,
however the initial investment is more. A techno-economic
study is required considering life of pavement, initial
cost,maintainance cost and driving comfort before selecting
wheather it should be the flexible pavement or rigid
pavement. The behaviour of rigid pavement against
earthquake particularly Zone-IV & V also has to be studided
while selecting rigid pavement.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
How to calculate Volume of Wet cement concrete for a specific grade?
What is an object snap mode?
How much quantity of rod binding work by a rod binder per day
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Forces in a Shear Wall are in plane or out of plane ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is the difference between tor steel and tmt steel?
How to calculate steel for beam slab and column
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
what is the weight of 6000 psi concrete in lb/cft?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?