Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     



 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location. &..

Answer / Abhishek Varshney

In Reinforced Concrete (RCC) structures with a 4-meter height, the column reinforcement is usually provided at appropriate intervals to ensure adequate strength and ductility. Laps in reinforcement should be properly aligned and overlapped to maintain continuity.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1 Answers   Das Infratech,


What kind of foundations used in block cotton soils

10 Answers   APPSC,


shuttering consumption per square feet in multi storeyed building?

6 Answers   L&T,


distinguish between under reinforced and over reinforced beams?

2 Answers  


how much cement sand n bricks required in im3?and how much in plaster?

1 Answers  


pile load testing procedure

1 Answers  


how can economic during construction of a project.

0 Answers  


what is w/c ratio in dry lean concrete for m10 mix design

1 Answers  


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1 Answers  


how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum

1 Answers  


how we can find sieve #4 is 4.75mm?

1 Answers  


Beam test is carried out for?

8 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)