what is the relation between seventh day strength & twenty
eighth day strength of cement concrete
Answers were Sorted based on User's Feedback
Answer / ravisobhan
7 days strngth is at 2/3rds of 28days stength. this is
required to check the concrete strength gaining in view of
removing formwork and to take preautionary measures incase
of failures before deshuttering.
Is This Answer Correct ? | 33 Yes | 0 No |
Answer / roby
For cement concrete the setting time is a dependent out put depending on type of cement..type & max dia of aggregates,admixtures..environmental conditions and al..inspite of all this IS:456-1984 suggest tat about 66.7%....but still it has to be performed in lab nd checked.......
Is This Answer Correct ? | 3 Yes | 4 No |
Answer / balaji
compressive strength of 28 days cube is more than the 7
days cube
Is This Answer Correct ? | 4 Yes | 8 No |
How much pressure will be drop when we apply the P.R.V. In the upvc downtake for stilt 28?
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
What is the diff. Between rectangle & parallelogram?
U are a civil engineering student?why do u want to enter into IT industry
1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit 2.0 what is the permissible westage of cement in construction work as above
32mm bar column lapping we use welding binding what is dimension of welding as per stander code?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.
Why we do soil classification?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m