what is the relation between seventh day strength & twenty
eighth day strength of cement concrete
Answer Posted / balaji
compressive strength of 28 days cube is more than the 7
days cube
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
If specific gravity of cement is less than 3.15 what is the cause?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
how u design STAGING for Superstructure in BRIDGE construction?
How do You Maintain a structure after getting cube test of low strength.
What is the strongest bridge for a school contest?
What is soil enforcement?
what is the use of beam end forces while using a staad ? wha they are show
how to conversation of all construction material in to brass
What is a tensile strength? What is the tensile strength of wood?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
How to check slab shuttering level.? Or check list for slab ?
What is OSHA compliance?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What is the difference between absorption & adsorption and sorption?