Is it possible to operate a synchronous 2-poles
turbogenerator with a still-in-place faulted bar but
electrically disconnected ???? If yes, should I act on the
other phases as well ???
No Answer is Posted For this Question
Be the First to Post Answer
what is meant by Is limiter?what is the use of current limiters in electrical ditribution network?
How Can Be Size Of Transformer Corelate With Freqvence?
relation between power station capacity and voltage level?
What is AMP and KA in a MCCB and MCB
what is circulating current in parallel transformer???plus how it is generated ???plz explain in detail.........
How to calculate Busbar Thickness for Different type of HT/LT panels
How open delta used for protection?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
how capacitor control the power factor/
what is two wattmeter test
Please mention any books for electrical design load calculation for industrial,commercial(to select cable,breaker,bus bar,stator,)
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)