Is it possible to operate a synchronous 2-poles
turbogenerator with a still-in-place faulted bar but
electrically disconnected ???? If yes, should I act on the
other phases as well ???
No Answer is Posted For this Question
Be the First to Post Answer
DG B-check,C-Check,D-check is depending upon the running hrs.If the running hrs is not reached as mentioned.How to conduct the DG checks.
how to calculate the no load current in transformer?
What is Scheme Test of High Voltage Switchgear. Which tests it includes.
For 160kw motor what size of cable and material is needed.?
what is the use of permanent magnet generator in exciter
What are the test involved in DG auto synchronizing panel before in manufacturing place before dispatch.
difference between the earthing,grounding and neutral
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
why Transformers power mentioned in KVA?. and why Generators and Motors power mentioned in KW?.
What are the testing to be done before the installation of 1000 KVA Transformer?
Hi, My question is our total motor load is 55 kw.so what cable size required for main supply. Please reply
What is ELCB?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)